A tenant is leasing 6 stories of an old 10-story building. The base building sys

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-9-30 09:09:07 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题C卷英文[查看]
A tenant is leasing 6 stories of an old 10-story building. The base building systems need to be upgraded to meet the cooling needs of the tenant. What statement is true about the project scope?
A: The upgraded systems must have a 3% improvement compared to the systems they are replacing
B: The upgrades would not be included in the LEED project
C: The upgraded systems must meet the requirements of ASHRAE 90.1-2010
D: The upgrades can be included or excluded at the discretion of the project team

参考答案: C

本题解释:
Notes: C:If the tenant requests the upgrades the systems are included in the project scope.

分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 19:00 , Processed in 0.079980 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部