- 注册时间
- 2012-6-6
- 最后登录
- 2025-9-5
- 阅读权限
- 200
- 积分
- 5712
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED v4 ID+C模拟题C卷英文[查看] A contractor is planning for an occupied flush-out to reduce IAQ problems from the construction of an office. The contractor introduces 3,500 cubic feet of outdoor air per square foot of floor area 3 hours prior to the first occupants arriving. What will need to be done next to achieve EQ Credit Construction IAQ Assessment? A: Continue the flushout until a total of 14,000 cubic feet per square foot of outside air has been delivered to the space B: Nothing, the flush-out is complete C: Flush out the space with 3,500 cubic feet of outside air per square foot of floor area each day for a period of 7 days D: Conduct a baseline IAQ test 参考答案: A
本题解释: Notes: For an occupied flush-out 3,500 cu. ft. air / sq. ft. must be used prior to occupancy. Ventilation must begin at least 3 hours prior to occupancy until a total of 14,000 cu. ft. air / sq. ft. of air has been introduced.
Option 1 Path 2 still requires a total volume of air of 14,000 cu. ft. / SF to earn the credit, after the initial 3,500 has been introduced. |
|