LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 293|回复: 0
打印 上一主题 下一主题

A project team has identified enough qualifying products to meet MR Credit Build

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-10-2 22:13:29 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题D卷英文[查看]
A project team has identified enough qualifying products to meet MR Credit Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 1 Raw Material Source and Extraction Reporting. What must be submitted for documentation of the credit?

A: Cradle to Cradle certification labels, GreenScreen benchmarks, or manufacturer\'s declaration (for REACH)
B: Health product declarations and GreenScreen benchmarks
C: The corporate sustainability reports from each manufacturer and the building disclosure and optimization calculator
D: Copies of all environmental product declarations and life cycle analysis reports

参考答案: C

本题解释:
选择C,本题解释A.This is required for MR Credit Building Product Disclosure and Optimization - Material Ingredients, Option 2 Material Ingredient Optimization. B.HPDs are documented for MR Credit Building Product Disclosure and Optimization - Material Ingredients, Option 1 Material Ingredient Reporting
GreenScreen benchmarks are documented for MR Credit Building Product Disclosure and Optimization - Material Ingredients, Option 2 Material Ingredient Optimization. D.This is required for MR Credit Building Product Disclosure and Optimization - Environmental Product Declarations, Option 1 EPD Declaration.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 17:07 , Processed in 0.076922 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部