For Integrative Process credit which factors must project teams assess for energ

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-10-2 22:25:05 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题D卷英文[查看]
For Integrative Process credit which factors must project teams assess for energy-related systems before completion of schematic design?
A: At least two potential load reduction strategies
B: At least one way to increase efficiency
C: At least one source of renewable energy
D: At least one load reduction strategy and one energy efficiency strategy

参考答案: A

本题解释:
选择A,本题解释There are five aspects to consider for energy analysis:
Building envelope attributes
Programmatic and operational parameters
Lighting levels
Thermal comfort ranges
Plug and process load needs
Project teams must assess at least two potential strategies for each aspect (so at least a total of 10 things are being checked).
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 19:44 , Processed in 0.074633 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部