A contractor has bins on the site of a construction project for commingled waste

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-10-3 08:29:13 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题D卷英文[查看]
A contractor has bins on the site of a construction project for commingled waste. Which statement is true about the project\'s ability to earn MR Credit Construction and Demolition Waste Management for diverting waste?
A: The project cannot earn the credit because the waste streams are not separated.
B: The project can earn the credit if the waste-sorting facility sorts the materials and provides average diversion rates.
C: The project can earn the credit if the waste-sorting facility sorts the materials and provides the diversion rate for the pro
D: The project can earn the credit by using the average diversion rate for the waste-sorting facility if the facility is regulat

参考答案: C

本题解释:
选择C,本题解释Commingled waste can count toward the credit if the waste-sorting facility provides the diversion percentages for the project\'s specific waste.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 16:25 , Processed in 0.073343 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部