LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 224|回复: 0
打印 上一主题 下一主题

A project includes an innovative external shading device that cannot be simulate

[复制链接]

1759

主题

1

好友

5684

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-10-7 22:28:30 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题D卷英文[查看]
A project includes an innovative external shading device that cannot be simulated by a modeling program. Which action should the energy modeler take as a result?
A: Use an exceptional calculation method to cover any savings
B: Exclude the shading device from the model
C: Choose the most similar shading device the modeling software has available
D: Provide a project narrative on the energy savings of the device

参考答案: A

本题解释:
选择A,本题解释Elements or systems that cannot be readily modeled by software require use of the exceptional calculation method (ECM).
The ECM is also used when any savings are claimed for a non-regulated load.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-6-23 23:27 , Processed in 0.075721 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部