An existing LEED for New Construction project will be renovated for a new tenant

[复制链接]

1759

主题

1

好友

5684

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-29 09:31:23 |只看该作者 |倒序浏览
试卷: LEED AP BD+C模拟题E[查看]
An existing LEED for New Construction project will be renovated for a new tenant. The surface area of the existing walls, floors, and roof is found to be 1,000,000 square feet. What is the minimum amount of building structure and building envelope that must be reused to achieve 3 points for Materials and Resources credit, Building Reuse: Maintain Existing Walls, Floors & Roof?
A: 500,000 square feet
B: 900,000 square feet
C: 800,000 square feet
D: 950,000 square feet

参考答案: D

本题解释:
Notes:
See ‘Requirements’ section of MRc1.1, Building Reuse: Maintain Existing Walls, Floors & Roof

95% of 1,000,000 sf = 950,000 sf
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-5-6 21:14 , Processed in 0.077160 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部