| 
注册时间2012-6-6最后登录2025-9-5阅读权限200积分5712精华3帖子1765
 
   
 | 
| 试卷: LEED AP BD+C模拟题A[查看] A core and shell project will contain 213,000 gross SF of which 183,180 SF are considered usable.
 The building is expected to use 11.7 kWh/SF/yr. How much energy must be from renewable
 sources to earn points for Energy and Atmosphere Credit, Green Power?
 A: 122,113 kWh
 B: 130,835 kWh
 C: 261,671 kWh
 D: 244,225 kWh
 
 参考答案: C
 
 本题解释:
 Notes:
 To earn two points for EA Credit 6, the core and shell project must purchase 35% of the building
 electricity from renewable sources for two years.
 Additionally, Core and Shell projects only account for energy used for the core and shell square
 footage, but it must be a minimum of 15% of the building total gross square footage. Calculate
 Core and Shell square footage, (GSF-USF) / (GSF) x 100.
 213,000SF - 183,180SF = 29,820SF / 213,000SF = 14%, but the credit requires we use 15%
 Core and Shell square footage is less than the minimum, so use the 15% minimum number in the
 calculation.
 213,000SF X .15 = 31,950SF
 31,950SF * 11.7kWh = 373,815kWh/yr is the default annual electricity consumption
 The project must buy 35% of this amount for two years.
 373,815 X .35 X 2 = 261,671kWh
 | 
 |