- 注册时间
- 2012-6-6
- 最后登录
- 2025-7-5
- 阅读权限
- 200
- 积分
- 5692
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED GA模拟题C[查看] Which of the following is not a goal of the LEED Volume Program? A: Encourage building owners to incorporate LEED, including documentation, into standard practices, procedures and tracking proc B: Provide cost-effective streamlined certification processes, reducing the documentation requirements wherever possible C: Provide a cost-effective path to achieving LEED certification on a volume scale D: Identify the basic construction and development activities for which the LEED program was designed to evaluate 参考答案: D
本题解释: Notes:
Reference: USGBC website
The LEED Volume Program is designed for owners that have a lot of new/existing buildings and want to implement LEED on a large scale. This program is a way to achieve volume certification more easily.
The LEED Volume Program encourages building owners to incorporate LEED, including documentation, into standard practices, procedures and tracking processes.
The LEED Volume Program helps streamline the certification process.
The LEED Volume Program helps keep costs down.
D is the description of the Minimum Program Requirements (MPRs), not USGBC\'s LEED Volume Program. |
|