LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 232|回复: 0
打印 上一主题 下一主题

A project team is deciding on the project boundary. What cannot be included in t

[复制链接]

203

主题

0

好友

512

积分

超级版主

Rank: 8Rank: 8

跳转到指定楼层
楼主
发表于 2013-8-28 12:13:54 |只看该作者 |倒序浏览
试卷: LEED AP ND模拟题B[查看]
A project team is deciding on the project boundary. What cannot be included in the boundary?
A: Street rights-of-way
B: Noncontiguous parcel
C: Privately owned parcel
D: Public alley

参考答案: B

本题解释:
The project cannot contain noncontiguous parcels, but parcels can be separated by public rights-of way.
Notes:

Reference: Introduction, page 8

Boundaries may encompass:

Privately owned parcels
Parcel plus adjacent rights-of-way
Multiple parcels
Intervening rights-of-way
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-8 09:56 , Processed in 0.072950 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部