A project is not on a previously developed or infill site. When can previously u

[复制链接]

203

主题

0

好友

512

积分

超级版主

Rank: 8Rank: 8

跳转到指定楼层
楼主
发表于 2013-8-30 11:37:30 |只看该作者 |倒序浏览
试卷: LEED AP ND模拟题D[查看]
A project is not on a previously developed or infill site. When can previously undeveloped portions of the site located within a 100-year moderate-risk floodplain be developed?

A: When all buildings are elevated above flood levels
B: When any floodplain water course is relocated
C: When they lie in a qualifying nonconveyance area
D: When they will contain a critical facility

参考答案: C

本题解释:
For Option 3 development is allowed within the floodplain on undeveloped portions of the site IF they lie within qualifying nonconveyance areas.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-8 15:16 , Processed in 0.073108 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部