LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 240|回复: 0
打印 上一主题 下一主题

A site has a wetland on it. What is not considered a minor improvement within th

[复制链接]

203

主题

0

好友

512

积分

超级版主

Rank: 8Rank: 8

跳转到指定楼层
楼主
发表于 2013-8-30 13:10:17 |只看该作者 |倒序浏览
试卷: LEED AP ND模拟题D[查看]
A site has a wetland on it. What is not considered a minor improvement within the 50 foot buffer of the wetland for SLL Prerequisite Wetland and Water Body Conservation?

A: Maintenance to existing utilities located in easements within the buffer
B: Installing 500 square foot restrooms around the wetland where the average distance between the structures is 200 feet
C: Installing lighting that is included as part of adding a pathway
D: Removal of invasive plants and replacement with native plants

参考答案: B

本题解释:
A:Though not listed in the requirements maintenance and improvements to utilities can be counted.
B:The average distance must be 300 feet or more, not 200 feet. The clearings (including the structure) can be at most 500 square feet.
C:Lighting for any pathways can be included as a minor improvement.
D:This would fall under \'b\' in the requirements.


Notes:

Reference: SLL P3, Implementation


分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-8 15:24 , Processed in 0.072048 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部