试卷: LEED v4 ID+C模拟题A卷英文[查看] A project team that uses what three strategies would achieve MR Credit Interiors Life-Cycle Impact Reduction, Design for Flexibility?(Choose 3) A: Ensure that at least 50% of nonstructural materials, by cost, are reusable or recyclable B: Obtaining commitment from the entire project team to ensure flexible strategies are not value-engineered out C: Include in at least one major component or systems purchase contract a clause specifying sub-contractor, vendor, or on site t D: Reuse, salvage, or refurbish furniture and furnishings for at least 30% of the total furniture and furnishings cost. E: Design at least 50% of interior nonstructural walls, ceilings, and floors to be movable or demountable 参考答案: ACE
本题解释: Notes:Use at least three of the following strategies.
Install accessible systems (floor or ceiling) for at least 50% of the project floor area to allow for flexible use of space and access to systems (under floor distribution systems) not entangled with other building systems.
Design at least 50% of interior nonstructural walls, ceilings, and floors to be movable or demountable.
Ensure that at least 50%, by cost, of nonstructural materials have integral labels.
Include in at least one major component or systems purchase contract a clause specifying sub-contractor, vendor, or on site take back system.
Ensure that at least 50% of nonstructural materials, by cost, are reusable or recyclable.
Implement flexible power distribution (i.e., plug-and-play) systems for at least 50% of the project floor area so that lighting, data, voice, and other systems can be easily reconfigured and repurposed.
Implement a flexible lighting control system with plug and play components such as wall controls, sensors, and dimming ballasts for a minimum of 50% of the lighting load.
B:This is part of developing goals but is not required for the credit. D:This is for Option 2. |
|