When conducting a job walk, which details should general contractors, construction managers, and owners verify for IAQ management?
A: No smoking has occurred in the building
B: The ductwork is sealed
C: The materials are stored outside
D: The materials are stored in mechanical rooms
E: The job site is kept clean

参考答案: ABE

本题解释:
选择ABE,本题解释For EQ Credit Construction IAQ Management Plan, a successful implementation depends on the following:
Including the agreement in contracts with subcontractors
Regular progress check-ins in subcontractor meetings
Posting a copy of the plan on site for easy reference
Verification that the plan is being followed.
The correct choices are part of the SMACNA guidelines.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 23:39 , Processed in 0.071847 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部