A CxA has been selected to perform the fundamental commissioning of a retail cen

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-9-26 22:30:26 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题B卷英文[查看]
A CxA has been selected to perform the fundamental commissioning of a retail center. At a minimum, which of the following must the CxA commission for LEED certification?
A: Selling the RECs from the system
B: Leasing part of a system belonging to a community solar garden
C: Installing a waste-to-energy system
D: Tying the system into a daylighting system

参考答案: B

本题解释:
选择B,本题解释B.A community garden can count as on-site renewable energy if the project owns the system or signs a ten- year lease. The system must be located within the same utility area as the project.If the system is leased, the project owner doesn\'t have to pay the up-front costs of the system, making it more economically viable. C.Waste-to-energy is not a type of renewable energy D.The two systems are unrelated.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-13 01:52 , Processed in 0.080155 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部