A LEED ID+C project will be constructed and operated on a permanent location on

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-9-30 09:00:33 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题C卷英文[查看]
A LEED ID+C project will be constructed and operated on a permanent location on existing land, and will be a minimum of 250 SF (22 m2). What else must the project do to meet the minimum program requirements?
A: The project team must perform an preliminary energy analysis before the completion of schematic design
B: The project must have at least one LEED AP on staff
C: The owner must hire a CxA that has experience on at least two other LEED projects
D: The project boundary must include all contiguous land that is associated with the project and supports its typical operation

参考答案: D

本题解释:
Notes:A:This is one of the requirements for IP Credit Integrative Process.B:This can earn an IN credit.C:This is part of the commissioning requirements.D:This is the 3rd MPR the project would need to meet.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 18:39 , Processed in 0.075919 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部