- 注册时间
- 2012-6-6
- 最后登录
- 2025-9-5
- 阅读权限
- 200
- 积分
- 5712
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED v4 ID+C模拟题C卷英文[查看] A project team is considering options for diverting the construction waste for a project. The project is in a rural area with little waste infrastructure, and the project cannot meet the waste diversion requirements through reuse and recycling. Which strategy should be considered? A: Storing the waste in a secure area on site B: Excluding those materials that cannot be recycled from the volume of total diverted waste C: Sending the waste to a landfill for incineration D: Use any wood waste as biofuel 参考答案: D
本题解释: Notes:A:This is not acceptable for the credit.B:Projects can\'t do this.C:Incineration is allowed as part of a waste-to-energy plan, but burning the waste on its own is not.D:Waste-to-energy is a viable option if reuse and recycling is not available. |
|