- 注册时间
- 2012-6-6
- 最后登录
- 2025-9-5
- 阅读权限
- 200
- 积分
- 5712
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED v4 ID+C模拟题C卷英文[查看] Which best practices ensure a project accurately calculates waste diversion for MR Credit Construction and Demolition Waste Management?(Choose 3) A: Maintain waste hauler reports B: File receipts for donated materials C: Estimate an average diversion rate for commingled waste D: Use source separation E: Visually inspect the waste to estimate diverted volume 参考答案: ABD
本题解释: Notes:A:Track all C&D waste leaving the site, and keep waste hauler reports and receipts for documentation.B:Keep receipts for donated materials. Donated materials may be estimated by weight or volume.C:Estimates are not allowed.D:Source separation on site ensures proper diversion has occurred and diversion goals are met.E:Visual estimates are not allowed. |
|