A 10-story office building will have many tenant spaces. A building owner and en

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-9-30 16:33:33 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题C卷英文[查看]
A 10-story office building will have many tenant spaces. A building owner and engineer are reviewing potential building automation systems for advanced energy metering to allow the owner to educate tenants about the energy use their tenant space is using. The team has found a system that uses a wireless network, will store all meter data for at least 36 months, and can be remotely accessible. What else will need to be included for EA Credit Advanced Energy Metering?
A: Each tenant must reduce their energy use by at least 10% for any individual energy end use
B: Each floor of the building must be submetered separately
C: Each tenant space must be submetered
D: Energy meters must record data hourly, daily, monthly, and annually

参考答案: D

本题解释:
Notes:A:For the building, any energy end-use that makes up 10% or more of the building whole must be submetered. The credit doesn\'t require reducing energy use.C:This is not required.D:The meters must record data at these frequencies at least.
The meters must also be permanent and record consumption and demand.
The data must have remote access.
Data collection must be networked (wireless, wired, cellular).
Data collection must be stored for at least 36 months.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 19:00 , Processed in 0.076440 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部