A project team is reviewing a map showing an office project, two functional entr

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-10-1 18:15:25 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题C卷英文[查看]
A project team is reviewing a map showing an office project, two functional entrances, transit stop locations, and walking routes and distances to transit stops. Which transit options do NOT qualify toward LT Credit Access to Quality Transit?(Choose 2)
A: A bus line a 1/4-mile (400-meter) walking distance of the project boundary that offers transit in only one direction
B: A rail line a 1-mile (1,600-meters) bicycling distance of both functional entrances to the building
C: A bus-line a 1/4-mile (400-meter) walking distance of one functional entrance that has trips in both directions
D: A ferry a 1/2-mile (800-meter) walking distance of the building\'s functional entrances

参考答案: AB

本题解释:
Notes:A:This choice has two problems:One: The bus line only goes in one direction. Two: The walking distance is measured from the project boundary when it must instead be measured from a functional entrance.B:Being able to bicycle to the transit service does not contribute to this credit.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 17:07 , Processed in 0.075991 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部