For a building renovation the architect\\\'s plan indicates reuse of interior el

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-10-1 20:08:53 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题C卷英文[查看]
For a building renovation the architect\'s plan indicates reuse of interior elements including wall partitions, flooring, doors, cabinets, and ceramic bathroom tile.
If the total interior surface area is 30,000 SF, what minimum area must be reused to comply with MR Credit Interior Life-Cycle Impact Reduction?
A: 22,500 SF
B: 15,000 SF
C: 7,500 SF
D: There is no minimum reuse to comply with the credit

参考答案: B

本题解释:
Notes: A minimum of 50% of building materials from off site or on site as a percentage of the surface area must be reused.
30,000 X 50% = 15,000 SF
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 16:37 , Processed in 0.076332 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部