Which project would not meet the minimum program requirements for certification?

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-10-1 20:10:02 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题C卷英文[查看]
Which project would not meet the minimum program requirements for certification?
A: A building project that is three stories high
B: A modular classroom that can be moved to another location on the school property
C: A new building on an office campus located next door to an existing certified building
D: A new laboratory building located partially underground

参考答案: B

本题解释:
Notes:A:Buildings do not have to be a minimum height. There are exceptions to which rating system might apply. For example, for residential projects, a building must be at least four habitable stories in order to use LEED BD+C: New Construction. Otherwise the project must use LEED BD+C: Homes。B:Structures must be permanent, so a temporary classroom would not qualify.C:New buildings located next to other buildings, certified or not, are fine.D:LEED does not prohibit part of the building being underground.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 16:55 , Processed in 0.073630 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部