- 注册时间
- 2012-6-6
- 最后登录
- 2025-9-5
- 阅读权限
- 200
- 积分
- 5712
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED v4 ID+C模拟题D卷英文[查看] For Integrative Process credit which factors must project teams assess for energy-related systems before completion of schematic design? A: At least two potential load reduction strategies B: At least one way to increase efficiency C: At least one source of renewable energy D: At least one load reduction strategy and one energy efficiency strategy 参考答案: A
本题解释: 选择A,本题解释There are five aspects to consider for energy analysis:
Building envelope attributes
Programmatic and operational parameters
Lighting levels
Thermal comfort ranges
Plug and process load needs
Project teams must assess at least two potential strategies for each aspect (so at least a total of 10 things are being checked).
|
|