A project team is conducting a one-week flush of an office during the summer for EQ Credit IAQ Assessment. During the flush-out, the painting contractors come back to complete paint touch-ups of the interior. Which statement is true about this scenario?
A: As long as the paint contains low-VOCs, no additional steps are necessary.
B: No additional time or testing is required for the flush-out.
C: Air-quality testing now additionally needs to be performed for those rooms receiving paint touch-ups.
D: The flush-out has to be re-started from the beginning.

参考答案: D

本题解释:
选择D,本题解释No construction work can occur during either the flush-out or the air-quality testing.
If any punch-list items that generate VOCs or other contaminants occur during either, the flush-out/testing must start again.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-6-25 06:50 , Processed in 0.082158 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部