What document does the project team create for the administrative and procedural

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-9-26 23:05:02 |只看该作者 |正序浏览
试卷: LEED GA模拟题F[查看]
What document does the project team create for the administrative and procedural requirements for salvaging, recycling and disposing of non-hazardous demolition and construction waste?
A: Building commissioning plan
B: Measurement and verification plan
C: Construction waste management plan
D: Building recycling plan

参考答案: C

本题解释:
Notes:

Reference: LEED 2009 for New Construction and Major Renovations Rating System
A:The commissioning plan is a document that outlines the organization, schedule, allocation of resources, and documentation requirements of the commissioning process.
B:Measurement and Verification plans are used to account for a building\'s energy consumption over time to optimize energy performance, minimize environmental impacts, and save on building operating costs. New Construction projects can earn a Measurement and Verification credit for implementing this type of plan.
C:A construction waste management plan contains the administrative and procedural requirements for salvaging, recycling and disposing of non-hazardous demolition and construction waste.
D:The building recycling plan addresses how materials should be collected and stored for recycling, once the building is occupied.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 03:31 , Processed in 0.079816 second(s), 27 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部