试卷: LEED GA模拟题C[查看] Which of the following are not Minimum Program Requirements for a LEED for New Construction project? A: All project must comply with applicable federal, state, and local building-related environmental laws, regulations in place B: The project must serve 1 or more Full Time Equivalent (FTE) occupant(s) C: The gross floor area of the LEED project must be no less than 2% of the gross land area within the LEED project boundary D: The project must have zero use of CFC-based refrigerants 参考答案: D
本题解释: Notes:
Reference: GBCI Minimum Project Requirements
This MPR is for complying with environmental laws. LEED NC, CI, CS, School, and Retail projects must be in compliance when the project is registered (or before the schematic design, whichever is first).
LEED NC projects must serve at least 1 FTE.
This requirement is for the minimum building area to site area ratio.
Zero use of CFC-based refrigerants is the prerequisite for Fundamental Refrigerant Management. This is not a MPR - it is a prerequisite.
|
|