试卷: LEED GA模拟题C[查看] What is true about implementing an erosion and sedimentation control plan for the grading of a Greenfield site? A: The plan must follow the EPA Construction General Permit or local standards and codes (whichever is more stringent) B: The plan must address at least 50% of the LEED project boundary C: The plan must be approved by USGBC D: The plan must address at least 75% of the property boundary 参考答案: A
本题解释: Notes:
Reference: LEED 2009 for New Construction and Major Renovations Rating System
Erosion and sedimentation control protect air and waterways from construction pollution. These plans must follow the more stringent of the 2003 EPA General Permit or local standards and codes.
LEED does not require the plan to be implemented for a specific percentage of the project.
C plan is not approved by USGBC.
LEED does not require the plan to be implemented for a specific percentage of the project.
|
|