A civil engineer is working with the project team to finalize a construction act

[复制链接]

1759

主题

1

好友

5692

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-11-10 17:59:32 |只看该作者 |正序浏览
试卷: LEED AP BD+C模拟题B[查看]
A civil engineer is working with the project team to finalize a construction activity stormwater pollution prevention plan. What must be included in this plan?
A: All measures to prevent stormwater contamination, control sedimentation,, and erosion during construction, and comply with th
B: Stormwater harvesting measurements
C: Quantity of total suspended solids removed
D: Pre and post stormwater discharge rates

参考答案: A

本题解释:
Notes:
Reference: Sustainable Sites Prerequisite, Construction Activity Pollution Prevention, Definitions
A stormwater pollution prevention plan is part of construction activity pollution prevention (not SS 6 Stormwater Design). The plan must include all measures to prevent stormwater contamination, control sedimentation and erosion during construction, and comply with the requirements of the Clean Water Act
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-7 16:33 , Processed in 0.072175 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部