A portion of a project site is covered by a 100-year moderate-risk floodplain. A

[复制链接]

203

主题

0

好友

512

积分

超级版主

Rank: 8Rank: 8

跳转到指定楼层
楼主
发表于 2013-7-24 14:56:08 |只看该作者 |正序浏览
试卷: LEED AP ND模拟题C[查看]
A portion of a project site is covered by a 100-year moderate-risk floodplain. An existing hospital is located in the floodplain. The hospital must be protected and operable during a 500-year flood event if the project is located on what type of site?

A: Infill or previously developed
B: All types
C: Infill or adjacent
D: Previously undeveloped

参考答案: B

本题解释:
Critical facilities must be protected and operable during a 500-year flood event for any type of project site if the facility is included in the project and the facility is located in a floodplain.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-7 21:27 , Processed in 0.075668 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部