LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 193|回复: 0
打印 上一主题 下一主题

A project has internal streets. What could the project have to achieve NPD Prere

[复制链接]

203

主题

0

好友

512

积分

超级版主

Rank: 8Rank: 8

跳转到指定楼层
楼主
发表于 2013-8-6 05:49:38 |只看该作者 |正序浏览
试卷: LEED AP ND模拟题C[查看]
A project has internal streets. What could the project have to achieve NPD Prerequisite Connected and Open Community?


A: One nonmotorized right-of-way intersecting the project boundary every 800 feet
B: One cul-de-sac every 800 feet
C: One through-street terminating at the project boundary every 800 feet
D: 90 or more intersections per square mile located within 1/4 mile of the project site

参考答案: C

本题解释:
A:This is not correct because this can only occur for 20% of the total.
C:This design would meet the requirements.
Notes:

Reference: NPD P3, Requirements
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-8 02:38 , Processed in 0.073161 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部