A project is located on a site with no wetlands and no water bodies. What must occur for the project to earn SLL Prerequisite Wetland and Water Body Conservation?
A: The site must be located 100 feet from any wetlands and 100 feet from any water bodies
B: The site must be located 50 feet from any wetlands and 50 feet from any water bodies
C: Nothing, the requirements are met because no wetlands and no water bodies are on the site
D: The site must be located 50 feet from any wetlands and 100 feet from any water bodies

参考答案: D

本题解释:
If the site doesn\'t have a wetland or water body, the site must still have a buffer around it from wetlands and water bodies outside of the given limits
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-8 05:20 , Processed in 0.075025 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部