试卷: LEED AP ND模拟题A[查看] Which of the following are not objectives of best management practices (BMPs) to control erosion and sedimentation in runoff during construction?
A: Prevent loss of soil during construction by stormwater runoff and/or wind erosion, including but not limited to stockpiling o B: Prevent sedimentation of any affected stormwater conveyance systems or receiving streams C: Limit disturbance to a minimum of 40 feet beyond the building perimeter; 10 feet beyond surface walkways, patios, surface par D: Prevent polluting the air with dust and particulate matter 参考答案: C
本题解释: This is an objective of GIB Credit 7.
|
|