Routine required maintenance of a stormwater harvesting system that is part of S

[复制链接]

203

主题

0

好友

512

积分

超级版主

Rank: 8Rank: 8

跳转到指定楼层
楼主
发表于 2013-11-5 16:53:14 |只看该作者 |正序浏览
试卷: LEED AP EB模拟题 D卷[查看]
Routine required maintenance of a stormwater harvesting system that is part of SS Credit 6
Stormwater Management must occur within:
A: 60 days of inspection
B: 60 days from the end of the performance period
C: 30 days from the end of the performance period
D: 3 months from the end of the performance period

参考答案: A

本题解释:
Notes:
See Reference Guide, SS Credit 6, Requirements
Perform all routine required maintenance, necessary repairs or stabilization within 60 days
of inspection. The inspection program must be annual.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-13 01:53 , Processed in 0.081585 second(s), 27 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部