第三方调试机构(Cx Agent)在项目的设计前阶段会做什么? Which action would a third-party commissioning agent most likely take in the pre-design phase of a project?
A: 研究设施使用的参数 Research the assumptions regarding usage of the facility
B: 核实建筑师和工程师的设计满足业主项目要求(OPR) Verify that the architect’s and engineer’s designs meet the owner’s project requirements
C: 根据设计图纸和设计参数收集生产厂家产品样式和型号 Collect specific manufacturer makes and models for drawings and specs
D: 编写设计基础文件(BOD) Write the Basis of Design (BOD)

参考答案: B

本题解释:
答案:B
分析:B:调试方需要核实OPR,BOD以及项目设计。OPR由业主完成,BOD由设计院完成。The CxA needs to verify the OPR, BOD, and project design.
A:This is part of the BOD.
C:This is part of the BOD.
D:The BOD is ’the information necessary to accomplish the owner’s project requirements, including system descriptions, indoor environmental quality criteria, design assumptions, and references to applicable codes, standards, regulations, and guidelines.’ - USGBC

The CxA does not write this document.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏2
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-6-21 16:05 , Processed in 0.073511 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部