重新调试(retrocommissioning)帮助项目实现下列哪些领域?

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2015-2-1 23:02:21 |只看该作者 |正序浏览
试卷: LEED v4 GA模拟题A卷中文[查看]
重新调试(retrocommissioning)帮助项目实现下列哪些领域?Which of the following project areas would retrocommissioning aid?
A: 运营能效 Operational energy efficiency
B: 在入住前找到系统的问题 Identifying system problems prior to occupancy
C: 高级能源计量 Advanced energy metering
D: 挑选环境友好的产品(EPP) Selecting environmentally preferable products

参考答案: A

本题解释:
正确答案:A
系统解析: 在入住前找到系统的问题是调试(Commissioning)而不是重新调试(Retrocommissioning),重新调试在入住后进行,一般至少一年一次。

A:Retrocommissioning is ’a commissioning process that can be performed on existing buildings to identify and recognize system improvements that make the building more suitable for current use.’ - USGBC
Retrocommissioning usually occurs at least one year after the building has been occupied.

B:Commissioning (not retrocommissioning) identifies problems before occupancy.
C:This is not correct.
D:This is not correct.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏1
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-14 01:54 , Processed in 0.082747 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部