Which of the following is the average payback period for the commissioning of ne

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2015-2-1 23:03:43 |只看该作者 |正序浏览
试卷: LEED v4 GA模拟题C卷[查看]
Which of the following is the average payback period for the commissioning of new buildings?

A: 1.5 years
B: 2.6 years
C: 3.9 years
D: 4.8 years

参考答案: A

本题解释:
正确答案:A
系统解析: D:Commissioning can be expensive but, compared to the savings it achieves over time, it’s one of the best investments a building owner can make. There are many studies that show the benefits of commissioning with examples of installation errors that cost building owners thousands of dollars a year unnecessarily.

A study by the Lawrence Berkeley National Laboratory found the following: ’For existing buildings, we found median commissioning costs of $0.27/ft2, whole-building energy savings of 15 %, and payback times of 0.7 years. For new construction, median commissioning costs were $1.00/ft2 (0.6 % of total construction costs), yielding a median payback time of 4.8 years (excluding quantified non-energy impacts).’
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-13 19:57 , Processed in 0.077676 second(s), 27 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部