An owner is questioning the additional costs of submetering of a mixed-use proje

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2015-2-1 23:03:43 |只看该作者 |正序浏览
试卷: LEED v4 GA模拟题C卷[查看]
An owner is questioning the additional costs of submetering of a mixed-use project’s water and energy systems. For what reason should the submeters be installed?
A: Submetering is a Minimum Program Requirement
B: LEED requires metering by subsystem of all energy and water based systems
C: The integrative process does not work without submetering data
D: Identifies disparities between how a project’s water-based systems are designed to operate and how they actually perform

参考答案: D

本题解释:
正确答案:D
系统解析: B:Subsystems are not required to be metered in LEED, only building level metering is required.

In LEED v4 building level energy and water metering is a prerequisite.

In LEED v2009 sharing energy and water use with USGBC is a Minimum Program Requirement (via utility statements or metering data).

Notes:

One of the intents of water metering is to determine if a building is performing as designed.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-13 19:46 , Processed in 0.075565 second(s), 27 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部