Which are the primary factors a project team should consider when deciding which

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2015-4-13 09:15:01 |只看该作者 |正序浏览
试卷: LEED v4 BD+C英文模拟题(A)[查看]
Which are the primary factors a project team should consider when deciding which water subsystems to meter? (Choose 3)
A: The cost of the submeters
B: The highest water consumers
C: The most expensive systems to operate
D: The number of submeters the subsystems require
E: The systems that most closely align with the goals of building management

参考答案: BCE

本题解释:
正确答案:BCE
解析:暂无
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-14 05:14 , Processed in 0.074167 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部