When estimating a landscape water requirement (LWR) for a project, which items would be included in the calculations from the landscape professional?(Choose 3)
A: Planting density/distribution
B: Fertilization needs
C: Types of plants
D: Pesticide application schedules
E: Irrigation system elements

参考答案: ACE

本题解释:
正确答案:ACE
解析:KKECO notes: The landscape water requirement (LWR) is the amount of water that the site landscape area(s) requires for the site’s peak watering month.
The factors used to calculate LWR are plant type, plant density, and the irrigation needs.

分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-14 08:05 , Processed in 0.076119 second(s), 27 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部