试卷: WELL AP模拟题英文A卷[查看] Which process is used to test air infiltration and ensure the building is airtight?
哪个过程用于测试空气渗透并确保建筑物是密闭的? A: Air flush 空气吹洗排污 B: Retrocommissioning 再调试 C: IAQ test 室内空气质量测试 D: Envelope commissioning 围护结构测试 参考答案: D
本题解释: 正确答案:D
解析:D:Envelope commissioning is performed after substantial completion and prior to occupancy to ensure the structure is airtight.
A:Air flush is used to remove or reduce pollutants inadvertently introduced during construction.
B:Retrocommissioning is a systematic process for identifying less-than-optimal performance in a facility\'s equipment, lighting and control systems and making the necessary adjustments.
C:IAQ tests measure levels of certain harmful pollutants in the indoor environment.
|
|