LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 374|回复: 0
打印 上一主题 下一主题

A new office building in San Diego has installed HVAC equipment that cannot acco

[复制链接]

1759

主题

1

好友

5722

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2015-12-25 16:53:25 |只看该作者 |正序浏览
试卷: WELL AP模拟题英文B卷[查看]
A new office building in San Diego has installed HVAC equipment that cannot accommodate MERV 13 filters. In order to achieve Feature 05 Air Filtration, what other way can the project team demonstrate that adequate particle filtration is addressed? 圣地亚哥的一座新建办公大楼安装了不能容纳MERV 13的过滤器的暖通空调设备。为了实现Feature 05空气过滤,项目团队还可以通过其他方式证明有足够的颗粒过滤处理?
A: 安装活性碳过滤器
B: 显示一个日历年中95%的时间,周边室外环境的PM10和PM2.5水平符合WELL标准
C: 安装MERV 10的过滤介质
D: 提供过滤器持续维护的文件

参考答案: B

本题解释:
正确答案:B
解析:B:This is the correct answer. The two options for earning Part 2: Particle Filtrations are:
a. Install MERV 13 filters
OR
b. Show that the project demonstrates that for 95% of all hours in a calendar year, ambient outdoor PM₁₀ and PM₂.₅ levels measured within 1.6 km [1 mi] of the building are below the limits set in the WELL Air Quality Standards Feature.
A:Accommodating rack space for future carbon filters is one of the requirements for Part 1: Filter Accommodation.
C:The minimum MERV rating required for filters in MERV 13.
D:This is a requirement for Part 3: Air Filtration Maintenance.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-12-22 04:00 , Processed in 0.270376 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部