- 注册时间
- 2012-6-6
- 最后登录
- 2025-9-5
- 阅读权限
- 200
- 积分
- 5712
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED v4 OM模拟题A卷英文[查看] Smoking cannot be prohibited for the full 25 feet (7.5 m) near a building\'s front entrance due to local code and the presence of a public sidewalk. Which action should the project team take for EQ Prerequisite ETS Control?
由于当地法规和公共人行道的存在,无法在建筑物正门入口附近25英尺(7.5米)范围内禁止吸烟。项目团队应采取哪些行动来满足EQ先决条件 环境烟控? A: Install a barrier between the public sidewalk and the building entrance在公共人行道和建筑物入口之间安装一道屏障 B: Provide documentation of the code提供当地法规证明文档 C: Pressurize the building entrance so smoke will not transfer into the building在建筑入口加压,使烟雾不会进入建筑物 D: Install no-smoking signs along the sidewalk 沿着人行道布置禁烟标识 参考答案: B
本题解释: 选择B,本题解释 If there is a code limitation, document it when submitting documentation for the prerequisite.Remember that public sidewalks are not considered used by businesses, so the no-smoking requirement doesn\'t apply.
|
|