试卷: LEED v4 OM模拟题A卷英文[查看] A project team is working with a general contractor to develop a site-specific plan before the start of some facility upgrades. What must the construction activity plan address for SS Credit Site Management?(Choose 2)
在设施升级开始之前,项目团队正在与总承包商合作制定特定场地计划。为了SS得分项场地管理,施工活动计划需要应对什么?(选2项) A: Preventing air pollution from construction dust 防止施工灰尘对空气造成污染 B: Reducing the emissions from construction equipment 减少施工设备的排放 C: Replacing turf areas 更换草坪区域 D: Restoring any eroded soils 恢复任何侵蚀的土壤 参考答案: AD
本题解释: 选择AD,本题解释 Teams pursuing this credit must prevent erosion sedimentation, restore any eroded soils, and prevent air pollution from construction materials and activities. |
|