Which action would a third-party commissioning agent most likely take in the pre-design phase of a project?
A: Research the assumptions regarding usage of the facility
B: Write the Basis of Design (BOD)
C: Collect specific manufacturer makes and models for drawings and specs
D: Verify that the architect\'s and engineer\'s designs meet the owner\'s project requirements

参考答案: D

本题解释:
Notes:A: This is part of the BOD. B:The BOD is \'the information necessary to accomplish the owner\'s project requirements, including system descriptions, indoor environmental quality criteria, design assumptions, and references to applicable codes, standards, regulations, and guidelines.\' - USGBC
The CxA does not write this document. C:This is part of the BOD. D: The CxA needs to verify the OPR, BOD, and project design.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-6-27 03:26 , Processed in 0.080802 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部