A project includes some salvaged wood flooring costing $50,000 and that was purc

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-9-23 15:19:28 |只看该作者 |正序浏览
试卷: LEED v4 ID+C模拟题A卷英文[查看]
A project includes some salvaged wood flooring costing $50,000 and that was purchased 500 miles (804 km) from the project site. What value does the wood have toward MR Credit Building Product Disclosure and Optimization - Sourcing of Raw Materials?
A: $45,000
B: $0
C: $100,000
D: $50,000

参考答案: D

本题解释:
Notes:See MR Overview Location Valuation Factor.
For a product to qualify for the location valuation factor two criteria must be met:
1. Sustainability
2. Extraction, manufacture, and purchase within the radius
If the product isn\'t sustainable, it counts as 0%.
If the product meets multiple sustainability criteria, it doesn\'t count more toward the total (salvaged material that contains recycled content can\'t be double counted).
D:The wood meets a sustainability criteria, but since it was purchased more than the 100 miles (160 km) from the project, it is valued at 100% (not 200%) of the cost.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-13 01:07 , Processed in 0.075838 second(s), 27 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部