- 注册时间
- 2012-6-6
- 最后登录
- 2025-9-5
- 阅读权限
- 200
- 积分
- 5712
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED v4 ID+C模拟题B卷英文[查看] A project that originally registered as one tenant space has undergone a change and now has two different tenants. Which action should be taken to determine if the space can remain a single project? A: Submit a project CIR B: Submit the issue via the feedback button within leedonline.com C: Submit a LEED interpretation D: Contact LEED technical customer service 参考答案: D
本题解释: 选择D,本题解释 A.If a project team needs guidance on an issue before submitting for certification review, the project CIR process is available to them. The project CIR will be determined by a GBCI Certification Reviewer familiar with the project\'s specific circumstances. The advantage of a project CIR is that the timeline for a ruling is relatively quick, and the project team can have certainty about the applicability of their strategy early in the design or implementation process. B.For assistance with broken prerequisite/credit forms and/or functionality within leedonline.com, submit issues via the feedback button, found on every page in leedonline.com.
The following are examples of LEED Online issues:
Requirements as described in the form do not match the rating system and/or reference guide material, or the project team member is having problems logging in, joining a team, or accessing projects or credits. C.This type of formal inquiry is relevant to many projects. These are examples of inquires that, after receiving a Project CIR, would also result in a LEED interpretation if the project team opted into the LEED-interpretations process. D.This path is meant to provide assistance with existing LEED guidance or processes.
|
|