The CxA is working with the building owner to outline the requirements of a systems manual for EA Credit Enhanced Commissioning. What should the systems manual include?
A: As-built drawings, equipment operations and maintenance manuals, final commissioning report
B: As-built sequence of operations, defined roles and responsibilities, blank testing materials
C: Equipment preventative maintenance schedules, minimum outside air requirements, construction checklists
D: Recommended schedule for recommissioning, basis of design, issues log

参考答案: A

本题解释:
Notes:A:See Step-by-step guidance for the complete list of what goes into a systems manual (too extensive to include here).
Test-takers should be familiar with the content that goes into each of the following:
OPR
BOD
Cx Plan
Cx Report
CFR and Operations and Maintenance plan
Systems Manual (Enhanced Cx)
Ongoing Cx Plan (Enhanced Cx)
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 20:11 , Processed in 0.080879 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部