A project team is working in a country where the WaterSense label is unavailable

[复制链接]

1759

主题

1

好友

5688

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-10-7 22:11:45 |只看该作者 |正序浏览
试卷: LEED v4 ID+C模拟题D卷英文[查看]
A project team is working in a country where the WaterSense label is unavailable and there is no acceptable substitute for the country in the International Water Labeling Program. What is true about the project team\'s ability to earn WE Prerequisite Indoor Water Use Reduction?

A: The project would be allowed to use alternative water sources for the prerequisite to reduce potable water use
B: The fixtures and fittings must comply with the 20%-below baseline requirement
C: The project team must import products from other countries that have acceptable international or WaterSense labels
D: The project cannot earn the prerequisite

参考答案: B

本题解释:
选择B,本题解释 A.This is not allowed. B.If the project doesn\'t have an acceptable WaterSense substitute as found in the International Water Labeling Programs on USGBC\'s website:
http://www.usgbc.org/resources/international-water-labeling-programs
The project must comply with the fixture performance requirement for water use at least 20% below baseline requirements. C.This would be possible but isn\'t required. D.This is not true.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-6-25 23:03 , Processed in 0.077168 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部