试卷: LEED v4 ID+C模拟题D卷英文[查看] When calculating a reduction in a project\'s parking footprint, which information would allow a project team to determine the baseline parking capacity? A: That this is a project site with a zero-lot line B: That the team is working on a 50-room hotel project C: That the building will have 10 regular occupants and 120 peak visitors D: That the project will include a 50,000 SF (4,645 m2) parking lot 参考答案: B
本题解释: 选择B,本题解释For LT Credit Reduce Parking Footprint, the baseline is specified as a percent reduction from the ITE handbook. The calculations of the base ratio is based on a project\'s use type and size.
Only the hotel project includes the type (hotel) and size (1.25 / room). |
|