试卷: LEED v4 ID+C模拟题D卷英文[查看]
When calculating a reduction in a project\'s parking footprint, which information would allow a project team to determine the baseline parking capacity?
A: That this is a project site with a zero-lot line
B: That the team is working on a 50-room hotel project
C: That the building will have 10 regular occupants and 120 peak visitors
D: That the project will include a 50,000 SF (4,645 m2) parking lot

参考答案: B

本题解释:
选择B,本题解释For LT Credit Reduce Parking Footprint, the baseline is specified as a percent reduction from the ITE handbook. The calculations of the base ratio is based on a project\'s use type and size.
Only the hotel project includes the type (hotel) and size (1.25 / room).
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-6-23 20:45 , Processed in 0.073906 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部