试卷: LEED v4 OM模拟题B卷英文[查看] A campus project has one water meter that serves many buildings. What statement is true regarding the project\'s achieving WE Prerequisite Building Level Water Metering?
某园区项目有一个计量多栋建筑的水表。关于项目取得WE 先决条件 建筑整体用水计量的说法正确的是?
A: Each building within the group must have an additional whole building water meter 园区内的每个建筑都要有一个额外的整个建筑的水表 B: The total potable water use can be included for a single building 总的饮用水可以被算作一个单独的建筑使用 C: The data from the single meter can be divided evenly between the buildings. 来自这个单独水表的数据可以被均分到每个建筑 D: The single meter can be used 可以使用单个水表 参考答案: A
本题解释: 选择A,本题解释A.To qualify for this prerequisite, each building within the group must have an additional whole building water meter. B.This is true for irrigation only. |
|